Monday, January 27, 2020

Literature Review Of Load Shedding Methods

Literature Review Of Load Shedding Methods In chapter 1, a brief discussion about active distribution networks was presented. The importance of operation of islanded distribution networks was discussed. This chapter is intended to give the reader a better understanding of the load shedding methods currently applied and proposed over the years. However, it is assumed that the reader is familiar with basic power system engineering. In section 2.2, the area of probability of islanding and the need for load shedding is discussed. To achieve this objective, existing load shedding methods are reviewed to understand their working principle, requirements, advantages and limitations. The main categories identified are the following (i) Manual / SCADA Load Shedding (ii) Load Shedding using thresholds, (iii) Adaptive Load Shedding, (iv) Intelligent Load Shedding and (v) Load Shedding Based on Static Optimisation which are described and discussed in sections 2.2 through 2.7 respectively. Finally a summary is given in section 2.8 from which a new load shedding method for an islanded distribution network able to address the limitations of existing methods will be proposed. probability of islanding There is by now a considerable amount of literature on load shedding. That most of the literature however deals with large interconnected systems. For smaller systems when a loss of mains / grid event occurs the islanded distribution network have different operating characteristics and restrictions that require different load shedding guidelines. These are due to the low inertia of the distributed generators, the limited spinning reserve and limited communication systems [0] [0]. Load shedding is a practice used power system and serves as a function to try to arrest any frequency or voltage drop when a fault isolating part of the distribution network occurs. Faults in power systems are inevitable, for various reasons such as adverse weather conditions, ageing and failure of equipment, accident, and animal contact. In general, faults happen when an abnormal physical contact occurs between lines or on lines to earth that create a short-circuit path. If the system is not well protected, the high fault current due to the short-circuit path can cause damage to the equipment in the system. Faults also affect the reliability and quality of the power supply, leading to power interruption by frequency and voltage collapse and voltage sag events. Regardless of the interruption period, the losses are often enormous both to the customers and power utility companies. There are two types of fault, determined by the physical nature of the short-circuit path: temporary or permanent. Common causes of temporary faults on overhead lines are lightning strike resulting in a flashover of the insulator; bird or animal contact; and momentary contact due to wind or trees. Faults caused by these events exist for a very short period of time. On the other hand, a permanent fault remains in the system until the short-circuit path is removed. Common causes of permanent faults in power system networks are cable insulation failure, objects falling on the overhead lines, dirt on insulators and lines falling to the ground. When faults occur, a protection device operates to isolate the faulty line from the rest of the system (loss of mains / grid). The generators designated to provide voltage and frequency control will respond to control the island voltage and frequency. In order to achieve smooth transition to island operation, the generators must firstly ride through the fault or failure and secondly act to balance the active and reactive power in the islanded network. With a carefully designed load shedding method the operation of the islanded distribution network might be possible. It is important however that the design of the load shedding method is designed on the understanding of the characteristics of the system involved, including system topology and dynamic characteristics of its generation and load. A poorly design method may be ineffective and eventually lead to total customer interruption. Over the years, however, utility experience and extensive studies on a number of systems have resulted in different methods guidelines. In the following section, principles and guidelines for load shedding methods are reviewed. manual / SCada Load Shedding Manual or operator initiated load shedding [0] is not a reliable method to be used to avoid frequency deviation. However it can be used by some utilities to manually shed load or open ties (interconnectors) with adjacent areas at a frequencies below automatic underfrequency thresholds. This type of action might be necessary to prevent any further frequency deviation and to recover the frequency back to the nominal value. This load shedding scheme cannot be used for the islanded distribution network as it will be very slow as the frequency and voltage in the network will collapse within few seconds making it impossible for the operator to decide the correct defence action required for safe operation. automatic Load Shedding using thresholds An automatic load shedding for transmission system using different schemes such as underfrequency, undervoltage and combinations of the two can be employed to avoid frequency or voltage collapse during a significant imbalance between generation and load. These types of load shedding methods are very dependant on off line studies of the systems dynamic performance and only consider the greatest probable imbalance between generation and load. These methods have to be coordinated with the protections of the generating units, shunt capacitors and other automatic actions that occur in the system during frequency and voltage variations. Underfrequency load Shedding The underfrequency load shedding scheme as explained in the following papers [0] [0] uses relays detecting the systems frequency. These are designed to operate on the instantaneous frequency value where they trip when the frequency drops below the set point of the relay. The shedding is accomplished in the systems distribution or transmission stations where major load feeders can be controlled by tripping of the circuit breakers (CB) automatically. Different settings can be applied in these load shedding schemes. Multiple stages can be used in the scheme [0]. The substation loads can prioritised and grouped according to the importance of the load. The relays can be set to control one or more groups of loads and when there is a frequency drop these can be disconnected sequentially where the group with the highest probability being disconnected the last. Each group disconnected should contribute to the system rate of change of frequency decline. If the load to be disconnected is small compared to the overall imbalance then the contribution will be insignificant and would cause further problems to the systems frequency decline. Another setting usual for this type of scheme is the time delay [0]. The time may can be required and used usually to avoid any frequency transient dips that could arise in the system. The time delay also avoids unnecessary load shedding by allowing the load / frequency controls in the system to respond to the frequency deviation. However load shedding performed with long time delays should be set appropriately as it will make the system more vulnerable to system stability if eventually load shedding is required. This method will work adequate in a situation where the system frequency decline is slow. For example, as discussed in [0], in the UK as stated in the NationalGrids GridCode each transmission area has to disconnect a defined percentage of the peak Demand that each Network Operator whose system is connected to the GB Transmission System shall disconnect by low frequency relays at a range of frequencies. The defined frequencies and the amount of loads are given in Table 1 -1. Table 1à ¢Ã¢â€š ¬Ã¢â‚¬Ëœ1: Load Shedding Scheme employed in the UK Frequency (Hz) % Demand disconnection for each Network Operator in Transmission Area NGET SPT SHETL 48.8 5 48.75 5 48.7 10 48.6 7.5 10 48.5 7.5 10 48.4 7.5 10 10 48.3 48.2 7.5 10 10 48.0 5 10 10 47.8 5 Total % Demand 60 40 40 The percentages in Table 1 -1 are cumulative such that, for example, should the frequency fall to 48.6 Hz in the NGET Transmission Area, 27.5% of the total Demand connected to the GB Transmission System in the NGET Transmission Area shall be disconnected by the action of low frequency relays. A significant drawback of this method is that the systems frequency must be already be low before the relay can operate which can delay the load shedding action and the frequency recovery of the system. Additionally these types of schemes usually shed more than the required amount of load. Undervoltage load Shedding Undrevoltage load shedding method has been successfully deployed in transmission systems to protect them from voltage collapse [0] [0]. System studies are required to determine which systems are potential candidates for suitable the undervoltage load shedding method. This method is most useful in slow decaying systems where the undervoltage load shedding relay time relays can coordinated accordingly and operate to alleviate the system from overload conditions and low voltages. Voltage collapse can be studied using steady state simulations for the identified areas using a power flow analysis. System planning engineers conduct numerous studies using P-V and Q-V as well as other analytical methods to determine the amount of load required to be shed to preserve voltage stability under different disturbances. Dynamic simulations can then determine the speed of the collapse and load shedding settings. An example as discussed in [0] in the US in the Puget Sound area, which is prone to voltage collapse has been studied. The voltage trip thresholds were determined from the results of steady state simulations of worst contingencies. The time delays for the relays were coordinated to address control actions of the automatic capacitor switching, generator limits, on load tap changing transformer using dynamic simulations. Table 1à ¢Ã¢â€š ¬Ã¢â‚¬Ëœ2: Load Shedding Scheme employed in the US Voltage (pu) Time delay (s) % Demand disconnection for Network Operator in Transmission Area 0.90 3.5 5 0.92 5.0 5 0.92 8.0 5 When the monitored bus voltages fall to 0.90 pu or lower for a minimum of 3.5 s then 5% of the load is disconnected. Additionally another 5% of load disconnection should occur when the voltage falls to 0.92 pu or lower for 5.0 s. There limitation associated with proper application of undervoltage load shedding is the location of its application.to where the relaying may be appropriately applied. If it is placed on a distribution line the effects of auto tap changers mask a system overload condition from the relay, or alternatively a line switching operation or the startup of a large industrial plant on one feeder could fool the relay. The relay would not be appropriate at locations directly adjacent to generation powerful enough to control bus voltages even during severe overloads. The relay is best applied to locations with fairly stiff voltages under all normal conditions, so a low voltage condition will reliably indicate a severe overload condition, as may be assumed to be the case at large substations associated with bulk power transmission lines and therefore this method cannot be effectively applied in islanded distribution networks where DG unit power and load demand varies. combination load Shedding In order to increase the security of the above discussed methods for underfrequency load shedding the relay could be set up to supervise the voltage, the current or the rate of change of frequency. According to their combined settings, the relay could either be blocked or initiate tripping of the CB to avoid any misoperations. One combination load shedding scheme is to use an underfrequency load shedding relay with voltage supervision. Basically the operation procedure of load shedding is blocked from operating unless the voltage is below a given threshold. The underfrequency relay will be able to trip the CB as long as the bus voltage it is monitoring is lower than a set point. Another combination is to use current supervision instead of the voltage. The purpose of the current supervision is to select which feeders to trip. This can achieved by monitoring which feeders are loaded above a certain point and then the relay will initiate the load shedding signal. An alternative is to use the rate of change of frequency for supervision [0] [0]. During a disturbance the supervision of the rate of change of frequency can block the tripping for very fast frequency changes but would allow for typical frequency decay rates. Also instead of measuring the instantaneous rate of change of frequency supervision is to use the frequency change trend. In other words by monitoring the average rate of frequency change will provide a more secure decision for tripping during disturbances. The load shedding decision of the scheme is made by monitoring the frequency change over a specified amount of time usually few hundred milli seconds. Therefore making the operation of the relay slower than the ones employing the rate of change of frequency. automatic ADAPTIve Load Shedding Adaptive control involves updating the amount of load to shed used by the method to cope with the fact that the conditions such as the power imbalance between generation and load of the system are time-varying or uncertain. It is important in these circumstances to minimise consumer disruption through proper design of the load shedding arrangements. An adaptive load shedding, is based on the relays reacting to a disturbance either by being instructed the amount to shed or by having certain defined criteria based on the rate of change of frequency. Anderson and Mirteydar in [0] present an adaptive methodology for setting of underfrequency relays that is based on the initial rate of change of frequency at the relay. The frequency performance of the islanded is represented by a linear system frequency response as shown in Figure 1 -1 and presented in more detail in the literature in [0]. Figure 1à ¢Ã¢â€š ¬Ã¢â‚¬Ëœ1: Simplified frequency response with disturbance input where: H = inertia constant (s) FH = fraction of total power generated by HP turbine TR = reheat time constant (s) Km = mechanical power gain factor R = droop characteristic (pu) D = damping factor Clearly the only observed quantity that gives any clue as to the size of the disturbance is the initial slope of frequency decline. The use of the initial slope to estimate the magnitude of the disturbance requires that every substation in the island will observe slightly different slopes and will therefore shed load based on different estimates of the disturbance. However on average the system as a whole will shed approximately the correct amount of load. To set the parameters for the relays as explained they are based on a simulation of the frequency response for the system. In the example given (H = 3.5 s, FH = 0.3, TR = 8.0 s, Km = 0.85, R = 0.06 and D = 1) the evaluation of the frequency and its slope against different amounts of disturbances are given in Table 1 -3. Table 1à ¢Ã¢â€š ¬Ã¢â‚¬Ëœ3: Initial Slope and Maximum Deviation vs Upset (frequency nominal 60 Hz) Pstep df/df ΆÃƒ Ã¢â‚¬ °max fmin pu pu/s Hz/s Hz Hz -0.2 -0.0286 -1.7143 -1.6438 58.356 -0.3648 -0.0521 -3.1260 -3.0000 57.000 -0.4 -0.0571 -3.4286 -3.2876 56.712 -0.6 -0.0857 -5.1429 -4.9313 55.069 -0.8 -0.1143 -6.8571 -6.5751 53.425 -1.0 -0.1429 -8.5714 -8.2189 51.781 The lowest frequency permitted in the system is 57 Hz from the nominal 60 Hz. Therefore when a magnitude greater than -0.0521 pu/s is observed load shedding must be triggered. This method relies on the fact that the amount of load shedding is a function of only the inertia constant and the observed slope. The inertia constant is the rotating kinetic energy of all units in the island divided by the total connected volt ampere rating of the units. This parameter has to be estimated. Therefore, the initial slope is the only unknown. The load shedding amount is computed in per unit, which makes it easy to apply to every load and to every load shedding relay. A positive is that communication is not required between relays and the boundaries of the island are not required to be known. However the drawbacks are that if it is applied for the islanding application of islanded networks this might not be possible as the method needs good estimates of the inertia of the system D, R, TR, Km and FH. This can significantly change with the varying DG units and loads in the distribution network. Another adaptive load shedding method presented by Terzija in [0] uses similarly as the previous method a variation of the typical swing equation. Due to the dynamic responses of turbines, governors, other control actions, spinning reserve, loads are not taken in account in the calculation of the required amount of load to be shed as given in . Where H is the inertia constants and assumed to be known in advance to the disturbance. The adaptive approach is based on real time estimation of fc (frequency of equivalent inertial centre) which is proposed to be calculated centrally by measuring the local frequencies at each generator. The proposed method assumes that the time constants in the power system are large and with modern communication this method would be possible for big power systems. However in distribution networks communication is believed not to change drastically in the near future making this application difficult to implement. This is because the estimation and control information are evaluated after the disturbance occurred. Van Cutsem and Otomega proposed a method in [0] which relies on a set of load shedding controllers distributed over the region susceptible to voltage instability. Each controller monitors the bus voltage and act on a set of loads located at that bus. Each controller acts when its monitored voltage falls below some threshold and trips at different time according the severity of the drop. The action can be repeated until the voltage is above the threshold voltage. The principle of operation of the controller is described as follows. The delay à Ã¢â‚¬Å¾ depends on the time evolution of V as follows. A block of load is shed at a time t0 + à Ã¢â‚¬Å¾ such that: where C is a constant to be adjusted. This control law yields an inverse-time characteristic: the deeper the voltage drops, the less time it takes to reach the value C and, hence, the faster the shedding. The larger C, the more time it takes for the integral to reach this value and hence, the slower the action. Furthermore, the delay is lower bounded: to prevent the controller from reacting on a nearby fault. Indeed, in normal situations time must be left for the protections to clear the fault and the voltage to recover to normal values. Similarly, the amount ΆPsh of power shed at time t0 + à Ã¢â‚¬Å¾ depends on the time evolution of V through where K is another constant to be adjusted, and ΆVav is the average voltage drop over the [t0, t0 + à Ã¢â‚¬Å¾]interval, i.e., Moreover, the whole system will tend to shed first where voltages drop the most. This location changes with the disturbance. Hence, the proposed scheme automatically adjusts the shedding location to the disturbance it faces. Note that the above features are achieved without resorting to a dedicated communication network. The controllers do not exchange information, but are rather informed of their respective actions through the power system itself. The drawback for this method for distribution network is that the tuning which consists of choosing the best values for Vth, C and K. A C and K combination suitable can be identified by minimising the total load shedding over all disturbance scenarios. Clearly this method would shed more loads for some scenarios. An additional concern is that the dynamic performance of the DG units and loads is not taken in account when performing load shedding if applied to the islanded distribution network and by trying to shed in steps the frequency drop in the network might drop significantly. automatic Intelligent Load Shedding Applications of intelligent load shedding in power system engineering (e.g. genetic algorithms, artificial neural networks, MonteCarlo etc.) have been demonstrated in [0] [0]. The characteristics which are inherent to intelligent methods, such as the ability to learn and generalization make it feasible for applications such as load shedding. You et al. in [0] discuss of a method that uses the rate of change of frequency to load shed. The method uses the same approach to calculate the required amount of load as in [0] and at the same time, the conventional load shedding method with undefrequency thresholds is incorporated to form a new two level load shedding method. The conventional load shedding method has longer time delays and lower frequency thresholds which can be used to prevent unnecessary load shedding in response to small disturbances. If the disturbance is large, the second layer will be activated and a block signal to the first layer is enabled. The second layer based on the rate of change of frequency load shedding will shed more load quickly at the early stage of the disturbance. Similarly as to paper [0], this method will have the same limitations when applied to the islanded distribution network. In the paper [0] which follows this study, the explanation of the selection of the settings for the relays is discussed. Agent technology is to try to assure that the method will withstand all possible disturbances. Traditionally after a major disturbance, the system is revisited and settings of devices and control actions are changed so that the system will withstand the same disturbance in the future. This however due to analysis of the system significant time and cost will be required. For the autonomous and adaptive learning capability for the agents, the reinforcement learning technique is used. Reinforcement learning is learning by interaction. The agent tries actions on its environment and then, the tendencies of taking particular actions are reinforced by receiving scalar evaluations of its actions. Thus determining the amount of load to be shed required to avoid collapse. The paper does not discuss whether the technique is applied online or offline through simulation. Clearly for the online this would not be ideal as it will take a lot of number of failures until the agents are properly set for that particular disturbance. For the offline simulation a concern is that for islanded distribution networks the topology, DG unit power and load demand will change thus making the decision of the action of the agents is difficult to train. Another concern is communication between agents. Fast communication would be required for coordinated decisions. Another approach to load shedding is the use of fuzzy expert system and is described in [0]. In this paper Sallam and Khafaga described a method to control the voltage instability by load shedding using fuzzy technique as fuzzy controller. The operation of the method relies on the experts knowledge which is expressed by language containing ambiguous or fuzzy description. The aim of this study is to design and analyse a fuzzy controller for the study to control against load and voltage instability by calculating the optimum load shedding as output. Similarly in [0] the authors propose genetic algorithms for the optimum selection of load shedding. These techniques search and optimise the amount of load shedding using objectives and constrains required for a practical load shedding method. Also in [0] the authors introduce another technique using the artificial neural networks is presented. To prepare the training data set for the artificial neural network, transient stability analysis of the power system is required and to find the minimum load shedding for various scenarios. By selecting the total power generation, total load demand and frequency decay rate as the input neurons for the method, the minimum of load shedding is determined to maintain the stability of the power system. In paper [0] Thalassinakis and Dialynas introduce a computational method using MonteCarlo simulation approach for the calculation of the settings of the underfrequency load shedding relays is discussed. The frequency performance as previously discussed in section 1.5 is used here as well. The strategy for the relay settings will be determined against amount of load to shed, time delay, rate of change of frequency and underfrequency level. A new strategy is developed by changing these settings. The MonteCarlo then computes the system through reliability indices of generating units, the system frequency and load shedding indices. load shedding based on static optimisation The first theory of applying load shedding using an on line dynamic simulation of the power system network was introduced by La Scala et al. [0]. Followed by an improvement of the method combing a control action to ensure angle and voltage stability enhancement in [0]. The first paper that introduced the same concept applied for large power systems to the smaller distribution network is described in [0] by Nelson and Aponte. A more recent study using similar technique is also presented in [0]. The paper presented in [0] describes the philosophy and the implementation of a preventive load shedding control algorithm for the application in dynamic security assessment. The methodology is based on nonlinear programming techniques, for assessing control actions to guarantee the dynamic security of power systems. The basic idea is that the online dynamic preventive control can be seen as a static optimisation problem with minimising function and equality and inequality constrains. The equality constrains consist in the discretisation at each time step of the differential algebraic set of equations representing the power system. The inequality constrains define a domain where the system trajectories should be contained in order to satisfy the requirements for the system performance stability and steady state voltage dips. In [0] the formulation includes corrective actions based on load shedding. The proposed method assumes that the analysis is performed to detect particular disturbances threatening the dynamic security of the system. The analysis is based suing the n-1 rule which is performed in advanced and applying the results immediately after the detected contingency. Each analysis has its associated strategies consisting with the corresponding amount of load to be shed at a fixed number of controlled nodes. The optimisation however is evaluated based on the steady state values of angle, voltage and active power (generator and load). Load shedding based on static optimisation performs load flow to calculate the initial P, V for all the nodes in the system. Then the method performs a transient simulation assessment to ensure the system is stable against angle and voltage. Followed by an approach to the minimisation of a function in presence of equality and inequality constrains consist in incorpora ting the inequalities in the cost function by adopting the penalty factor method and treating the whole problem as a minimisation in presence of the sole equality constrains by the use of Lagrange multipliers. This method has been used for synchronous generators in transmission systems. However in distribution networks because of the diversity of the generators and their ride through capability this approach could result in conditions where optimised solutions do not meet the requirements as shown in Figure 1 -2 [0]. Figure 1à ¢Ã¢â€š ¬Ã¢â‚¬Ëœ2: Ride through capability of Generating Unit, DC Converter or Power Park Modules. Explanation of graph required. Each Generating Unit, DC Converter or Power Park Module shall remain transiently stable and connected to the system without tripping. However for small generating units connected in the distribution network their transient behaviour could be as shown in Figure 1 -2 b and c where local protection and circuit breaker operation of generators or sensitive equipment will be disconnected after such a response. Similar to the voltage is for the frequency range. Therefore the load flow with corrective control for angle and voltage stability approach for the load shedding optimisation is not appropriate for distribution networks. In [0] and [0] describe of a method implemented in distribution networks where not only the amount of load shedding is optimised but also the time for the disconnection. The current trend is to apply the corrective measures as soon as possible or delayed for the sake of event discrimination. The study and results however show that when the corrective action is applied at the optimal time increased damping and enhanced response are observed. summary The use of load shedding as a tool to keep the network stable has been constantly evolving, and different approaches have been formulated. Relaying schemes like underfrequency and ROCOF [0] [0] are some examples of the mechanisms implemented to trigger a load shedding event. Typical load shedding schemes based on predefined threshold set points is quick, simple and reliable measure against system disturbance. When the frequency of the system reaches a specified threshold value, a time delay is inserted prior to the shedding action in order to avoid overshedding and assist the coordination of the next stage of load shedding action. This technique however when adopted for the islanded operation of small distribution networks would have several disadvantages. Too few frequency levels could lead to overshedding, but on the other hand, time delays between stages could add up and may not allow for enough load to be shed in time to re-establish nominal frequency. The implementation of ROCOF techniques mitigates some of these problems. The ROCOF value calculation is an immediate indicator of the power imbalance; but for the distribution network the variation of the DG units operation would make this measurement unreliable. Also the average ROCOF calculation may take too long and eventually make the load shedding method slow in operation. Even if accurate measure of the islanded distribution network ROCOF valu

Sunday, January 19, 2020

emmitt smith :: essays research papers

Emmitt Smith & His Annual Rushing Yards   Ã‚  Ã‚  Ã‚  Ã‚  Emmit Smith announced his retirement February 3, 2005. It was a very emotional moment for Smith, who has played running back in the NFL for fifteen years (thirteen of those years for the Dallas Cowboys). As Smith announced his retirement tears began to flow down his face stating â€Å"It’s been a tremendous ride.† Over his career in the NFL, Smith has racked up many impressive statistics and awards. Smith has played on three Super Bowl championship teams (including an MVP award in 1993). Smith is currently the NFL’s all time leading rusher with 18,355 yards.   Ã‚  Ã‚  Ã‚  Ã‚  For my derivative project I chose to graph Emmitt Smith’s annual rushing yard total. Emmitt was drafted out of University Florida in 1990 and began his career as an NFL Great. As you can see on the graph, Smith began his career slowly, amassing only 937 rushing yards his rookie year. However, his second year Smith improved to 1563 rushing yards. In his third season, Smith again improved to 1713 rushing yards. The decrease in production Smith’s fourth and fifth year (1486 and 1494 respectively) in the NFL can be partially credited to the fact Smith did not compete in all sixteen regular season games due to injuries. Smith redeemed himself the following year with a career high 1773 rushing yards. Over the next six years Smith’s age slowly caught up to him as he ranged from 1021 to 1397 yards. Finally, after his thirteenth year as a Dallas Cowboy, Smith was traded to the Arizona Cardinals. In his first year with the Arizona Cardinals (2003), Smit h was injured and played as a backup for the majority of the year. This is illustrated through his career low 256 rushing yards. However, in Smith’s final year in the NFL, he rushed for 937 rushing yards, bouncing back from a disappointing year. Strangely, Smith ended his last season with the same rushing total as his rookie season. I plotted these points in a graph in an excel document and created a line of best fit. This line was a cubic equation (f(x) = 1.4228x3 - 8533.3x2 + 2E+07x - 1E+10).   Ã‚  Ã‚  Ã‚  Ã‚  To calculate the first derivative, I found the average rate of change of Emmitt Smith’s annual rushing yards from the two years surrounding the year I was deriving. Smith’s yards per year had an increasing slope in the years 1990, ’91, ’94, ’97, ’98, and 2004.

Saturday, January 11, 2020

Justify your choice of major theme(s) in the novel “Of Mice and Men”, and trace its/their development Essay

Within the novel â€Å"Of Mice and Men†, numerous different themes are evident. These range from death (the killing of Curley’s wife and of Lennie) to nature (the descriptions of the scenery at the beginning and towards the end of the story). However, the themes that I will consider are that of friendship and of the ‘American Dream’. Friendship, in my opinion, is one of the most regularly occurring themes in the story because of all the struggles George and Lennie have to overcome in their friendship, for example, keeping Lennie out of trouble so as to avoid any further predicaments. Also, it is considered slightly strange that these two men (Lennie and George) have travelled together for so long given the trend at the time of itinerant workers who were almost constantly changing their workplace. This shows how strong their bond is and how they would never leave each other. To further enhance this point of the constant occurrence of friendship, we see all the other friendships present on the ranch like Candy’s friendship with his loyal dog and the general friendship between all the ranch ‘guys’. Candy particularly has a strong friendship between himself and his dog. His feelings are clearly evident in the scene in which Carlson volunteers to shoot his dog. Candy is extremely reluctant but allows it anyway. However, he soon realises his mistake after he has decided to become a part of George and Lennie’s dream and we can see he regrets it when he tells George â€Å"I shouldn’t ought to of let no stranger shoot my dog.† Another friendship that is present and the most integral to the story is the friendship between George and Lennie. This friendship has many different sides to it like anger and happiness and even George being protective of Lennie. George sometimes can’t stand the sight of Lennie and constantly breaks into sudden outbursts about how â€Å"life would be easy† without Lennie. Yet deep down George realises that he took up the responsibility for looking after Lennie after his Aunt Clara died and knows he could never desert Lennie because they need each other equally. Their friendship also links into the other theme I have chosen, the ‘American Dream’. This theme is what bonds Lennie and George together because they know that they have a purpose and will eventually get somewhere, which is another reason why George doesn’t leave Lennie. Moreover, this theme is also one of the main sources of conversation between George and Lennie. For example, the way Lennie constantly tells George to â€Å"tell how it’s gonna be.† Again, like friendship, the theme of the ‘American Dream’ is also a regularly occurring theme that is never far from the action. For example, in the fight scene with Curley and Lennie, it was because Lennie was grinning at the idea of the dream materialising that Curley, upset about his wife, decided to pick a fight with him thinking Lennie was laughing at him. Additionally, to emphasise this point further, there is a final recitation of it just before George shoots Lennie. George shoots Lennie because he feels that it is his responsibility and he didn’t want to see Lennie get shot â€Å"in the guts† at the hands of Curley. The dream also has an aura of infectiousness to it and the reader can see this when George and Lennie are going over it again to each other and Candy overhears them and wants to become a part of it. Furthermore, in the scene with the four ‘rejects’ (Lennie, Crooks, Candy and Curley’s wife), we see that Crooks also wants to facilitate the dream becoming a reality when Lennie inadvertently lets the idea slip out, but by the time the scene has ended, Crooks withdraws because of the verbal attack by Curley’s wife on him. â€Å"Keep your place then, Nigger. I could get you strung up on a tree so easy it ain’t even funny.† A further example of friendship is how nobody tries to befriend Crooks because he is black with the exception of Lennie because he doesn’t know the difference. Back then, in society, racism was openly accepted and it wasn’t thought unusual for blacks and whites to be separate. It was regarded as the way it was meant to be. In the case of Crooks, his circumstances also link into the themes of Racism as well as Loneliness, other themes within the novel. The two themes I have chosen both have twists in their paths. With friendship, it is introduced almost straight away when we read the descriptions of the two men although at first we don’t know the connection between them. However, as the story unfolds, their relationship becomes more apparent and we begin to see the depth of it. To begin with, we have the basic emotions and things that can happen within a simple friendship. For example, when Lennie has a dead mouse and is stroking it, George takes it away but Lennie is hesitant. The emotions range from anger, â€Å"give me that mouse or do I have to sock you?†, to a caring side when George consoles Lennie after he has confiscated it, â€Å"I ain’t taking’ it away jus’ for meanness.† On the other hand, as we go deeper into the friendship, we learn that despite the incident in Weed, George is still taking care of Lennie thus concluding that his feelings for Lennie are stronger than those in an ordinary friendship and we can also see that their relationship resembles that of one between brothers. As we move onto the ranch, we see that there is a general sense of friendship between all the ranch ‘guys’ and also see that racial discrimination is evident in the form of Crook’s loneliness. Returning to Lennie and George, when they’re introduced to Curley, the defensive element of their friendship comes back into play when Curley gets annoyed that Lennie isn’t talking, George becomes protective of Lennie and defends him. Again, the friendship has drastic contrasts, for example, one minute George is almost going to hit Lennie and the next, he’s preventing him from getting hit by Curley. A new character comes into the fold in the form of Slim who is more appreciated by George than Lennie although he gives Lennie one of his pups. George becomes friendly with Slim by confiding in him about Lennie. For example, he tells him about Weed and how when earlier, he used to beat Lennie up but Lennie would never retaliate and the time when he told Lennie to jump in the river and Lennie did. This builds up an element of trust within their newly formed friendship. â€Å"An’ he jumps. Couldn’t swim a stroke. He damn near drowned before we could get him.† Finally, we come to the final scene and this is when George and Lennie’s friendship really hits a downfall. After Lennie has killed Curley’s wife and has run off, Candy finds the body and informs George. Judging from George’s reaction, (â€Å"I should of knew. I guess way back in my head I did.†), it can be interpreted that he realises what the circumstances will be resulting from Lennie’s actions. Nonetheless, he joins the ensuing manhunt, knowing where to find Lennie, and meets up with him â€Å"in the brush†. At this period in the novel, we can sense the apprehension within George simply from his actions and responses to Lennie. For example, when Lennie says â€Å"I done another bad thing.† â€Å"It don’t make no difference,† George said, and he fell silent again.† Even so, George realises that Lennie can prove to be a menace to society and is unsafe because everyone is looking for him. George manages to be mentally strong and shoots Lennie because he doesn’t want his long time cherished friend suffering an agonising death at the hands of someone else. Ironically, we see that as one friendship ends, another one blossoms as George walks off with Slim. The theme of Friendship runs through the entire novel and even beyond with the new friendship formed between George and Slim – although it can’t possibly replace his friendship with Lennie. For the ‘American dream’, it also follows a path, which changes as it unfolds. We first learn of it during the first scene where we are introduced to George and Lennie when, after George has just shouted at Lennie, Lennie tries to win him back over by telling George to tell â€Å"how it’s gonna be†. We are surprised that what could be labelled as two ‘oddballs’ (one is like a giant, the other like a mouse) are unified by something so simple. From then on, the dream takes a backseat until it reappears when Lennie and George are telling it again and Candy overhears them. As mentioned earlier, the dream has an infectiousness aura about it and this is what has drawn Candy to it, the fact that you can have your own independence and avoid taking orders from a boss. It is at this point in the novel that Lennie and George (with Candy’s input) are the closest they’ll ever be to actually seeing this ‘dream’ of theirs become a reality. Later, Crooks also falls victim to this idea of independence and freedom such is its ability to attract people towards it. Unfortunately though, at the end of the scene, he withdraws because of the verbal attack on him by Curly’s wife. Curley’s wife reminds Crooks that he is black and black people in those days were oppressed, resulting in even the simplest aspirations of a person not being realistic. Another point about the dream is how it’s earned Lennie the tag of being stupid. For example, in conversations with Crooks and Curley’s wife, he says things about the rabbits he will soon be able to tend and how he shouldn’t do wrong or he won’t be able to tend them. He is so obsessed with this idea that its all he talks about to others and this has lead both Crooks and Curley’s wife to calling him crazy because they don’t know what he’s talking about and this is a factor as to why he is considered slow, not just because of his intellectual inability but also because of the things he says not following the thread of conversation. Lastly, in the final scene, Candy asks George if the dream is off after they find Curley’s wife’s body but he doesn’t respond. In any case, when he meets up with Lennie, Lennie requests that George tell the dream again one last time. George obliges and then shoots Lennie during it, signalling the end of the dream they once shared. The theme of the ‘American Dream’, like that of Friendship, is introduced almost from the beginning and runs right through till the end but doesn’t extend beyond however as it’s been given a conclusion. The two themes chosen are interconnected very closely: The complications of George and Lennie’s friendship got in the way of them realising their â€Å"dream†. The friendship and dream got in the way of each other spelling disaster for both. For example, Lennie being killed (friendship) and the dream not seeing the light of day (‘American Dream’). This point also links with the meaning of the title of the novel.

Friday, January 3, 2020

Evidence-Based Practice and Alzheimer’s Disease - 1312 Words

EVIDENCE-BASED PRACTICE and ALZHEIMER’S DISEASE Introduction As defined in 2012 by the American Nurses Association, â€Å"nursing is the protection, promotion, and optimization of health and abilities, prevention of illness and injury, alleviation of suffering through the diagnosis and treatment of human response, and advocacy in the care of individuals, families, communities, and populations. â€Å"To deliver the best optimal treatment when performing their duties, nurses are taught to follow evidence-based practices (EBP). Following EBP when dealing with clients especially those affected by Alzheimer’s disease facilitates the nurse in performing his/her main responsibilities†¦show more content†¦Disease management In addition to promoting health and reduce risk for disease, nurses play an important role in ensuring that proper disease management is in effect. Disease management is the implementation of the client plan of care prescribed by the physician and includes reminders, education, and other materials. Di sease management requires suitable support to improve patient self-management activities and monitor recommended care for each client (â€Å"Disease management (position paper),† 2012). Examples of disease management by the nurse will be to monitor client compliance to prescribed diet and evaluate interventions outcomes. Benefits and strategies of using evidence-based practice in nursing plan of care When using scientific reasoning and evidence based practice, the nurse avoids working imitation, intuition, or tradition (Osborn and Watson, 2009).This approach allows the nurse to create a personalized and individualized plan of care, resulting in optimal quality care and outcomes, and reduced medical costs. It improves the nurse knowledge and skills, keeping him/her up to date about new interventions and nursing practices. Evidence-based medicine (EBM) involves caring for patients by explicitly integrating clinical research evidence with pathophysiologic reasoning, caregiver experience, and patient preferences. (Cook and Levy, 1998) .According to Potter and Perry (2011), strategiesShow MoreRelated Alzheimer’s Disease Essay1067 Words   |  5 PagesPeople with Alzheimer’s disease have impaired abilities due to the destruction of nerve cells in the brain (American Occupational Therapy Ass ociation, 2011). Alzheimer’s disease is a â€Å"degenerative brain disease of unknown cause that is the most common form of dementia, that results in progressive memory loss, impaired thinking, disorientation, and changes in personality and mood, that leads in advanced cases to a profound decline in cognitive and physical functioning† (Merium-Webster dictionary)Read MoreClinical Comparisons Of The Neurodegenerative Proteinopathies1203 Words   |  5 PagesClinical Comparisons of the Neurodegenerative Proteinopathies Alzheimer’s disease and Chronic Traumatic Encephalopathy Alzheimer’s disease (AD) and chronic traumatic encephalopathy (CTE) are neurodegenerative diseases with overlapping biomarkers and behavioral symptoms, thus making the diagnosis of CTE difficult to fully address and identify. Additional concerns over the effects and correlation of multiple concussions are arising clinically as well as socially. Despite its recent attention andRead MoreCognitive Disorders And Its Effects On The Brain1412 Words   |  6 Pagesfunction have been destroyed. The majority of dementia cases (60% to 80%) are classified as Alzheimer’s disease (AD) (Kalaria et al., 2008). The number of Americans living with Alzheimer’s disease is rapidly growing. According to the Alzheimer’s Association, in 2016, an estimated 5.4 million Americans of all ages have AD (Alzheimer s Association [AA], 2016). Of the 5.4 million Americans with Alzheimer’s, approximately 5.2 million people are age 65 and over, and an estimated 200,000 individualsRead MoreThe National Social Advocacy Association859 Words   |  4 Pagesgrant to establish an innovative, comprehensive social advocacy, intervention, and advance treatment programs in healthcare facilities serving or providing Alzheimer’s patients. One that will help stimulate the â€Å"Central Nervous System and Peripheral Nervous Systems sensory† nerves which will increase the cognitive and mobility functions in Alzheimer’s Patients Marieb, (2006). The objective is to e ducate or provide education for students from an accredited colleges/universities enrolled in a social workRead MoreEssay On Fall Intervention757 Words   |  4 PagesIntervention The goals of this project to reduce falls in the long-term care neuro-cognitive disorder population; in which Alzheimer’s disease is the most prevalent form of dementia. Reducing falls in the Alzheimer’s inpatient population using the long-term fall risk assessment; by providing an individualized plan of care for each resident through collaborating with nurse practitioners. The Quality improvement project is designed to enhance health experience for residents and families as wellRead MoreA Research Study On Alzheimer s Disease1394 Words   |  6 PagesAlzheimer’s disease is the sixth leading cause of death in the United States and the fifth leading cause of death in people over the age of 65, as determined by the (Center for Disease Control, 2015). The number of people living with AD is predicted to triple by 2050. The risk of developing Alzheimer’s rises exponentially with age. â€Å"Currently, verification of an AD diagnosis occurs through postmor tem detection of pathology in neural tissue, specifically extracellular amyloid plaques and intracellularRead MoreResearch Article Critique on Alzheimers Disease1720 Words   |  7 PagesWoodward, M., Kirwan, J., Clarnette, R., amp; ... Greenspan, D. (2005). Risperidone for psychosis of Alzheimers disease and mixed dementia: results of a double-blind, placebo-controlled trial. International Journal of Geriatric Psychiatry, 20(12), 1153-1157. 2. The purpose of this study is to evaluate the efficacy and safety of low dose risperidone in treating psychosis of Alzheimer’s disease (AD) and mixed dementia (MD) in a subset of nursing-home residents who had dementia and aggression andRead MoreCase Study - Early Alzheimers1730 Words   |  7 PagesRunning Head: EARLY ONSET ALZHEIMER’S DISEASE Case Study of Early Onset Dementia of the Alzheimer’s Type by Nico Mulder, Ph.D Faculty of Behavioral Sciences, Y University for Biological, Developmental amp; Scientific Basis of Behavior February 26, 2012 Abstract This paper reviews the use of cognitive rehabilitation treatment of early stage of dementia Alzheimer’s type. The case study examines a 72 year old male patient diagnosed with early stage dementia of Alzheimer’s Type. This study usedRead MoreWhat Is CDSS?1095 Words   |  5 Pagessome areas in healthcare practice that could be affected by the use of CDSS, including support decisions with clinical evidence, disease diagnosis and control of prescription medications (2015). Using CDSS has been associated with evidence of potential improvements in health care quality. However, to achieve this improvement in practice, some requirements, such as accurate and knowledge-based evidence, are needed (Sim et al., 2001). Sim et al. concluded that this evidence could provide a quick andRead MoreThe Most Common Risk Factor For Alzheimer Disease1537 Words   |  7 Pagesalzheimer s disease. Risk factors on their own are not causes of a disease. Risk factors represent an increased cha nce, but not a certainty, that Alzheimer’s disease will develop. The most common risk factors are age,history and heredity but evidence suggests that there may other factors that can be influenced. Ageing is the most common risk factor for alzheimer disease. Most individuals that are diagnosed with this condition are 65 or older. The likelihood of being conspired by this disease doubles